Featured partner

GetContractor Reinstatement

Trends Interior Design has carried out office and retail reinstatement in Singapore since 1999 with its own team and no subcontractors. It takes units back to bare condition: dismantling electrical and aircon, removing partitions, restoring ceilings and floors, repainting, clearing debris and doing the final clean. It also prepares the MCST and landlord submissions and SCDF approvals, so handover goes smoothly. It quotes within 24 hours, and small jobs can be finished in as little as a day.

Visit reinstatement.getcontractor.sg ↗

Need a quote for office reinstatement in Singapore?

Send your job details and a few photos on WhatsApp. Free, no obligation.

Get a quote on WhatsApp

21 verified Office Reinstatement

BCA workheads (grade)
Anderco Pte. Ltd. Tuas CW01 B1 CW02 C1 CR01 SG CR06 L3 2027-08-01 6/8
Azcendant Private Ltd. Sembawang CR01 SG CR06 L1 CR09 L1 2027-08-01 6/8
Bespoke Builders Pte. Ltd. Sembawang CW01 C3 CR01 SG CR06 L1 2027-11-01 6/8
Diamond Glass Enterprise Pte. Ltd. Bedok CW01 C3 CR01 SG CR06 L1 CR09 L2 2028-11-01 6/8
Lhn Parking Pte. Ltd. Downtown Core CR01 SG ME04 L1 2028-03-01 6/8
Long Zhou Engineering Pte. Ltd. Sembawang CW02 C1 CR01 SG ME12 L3 2027-11-01 6/8
Mega Exhibition Events Private Limited Toa Payoh CR01 SG ME05 L1 2027-12-01 6/8
Office Empire Pte. Ltd. Sembawang CR01 SG CR06 L1 CR09 L1 2028-01-01 6/8
Sing Tatt Construction Pte. Ltd. Woodlands CW01 B2 CW02 C1 CR01 SG CR06 L3 2027-07-01 6/8
Techart Global Pte. Ltd. Sungei Kadut CR01 SG CR06 L5 ME01 L1 ME05 L1 ME06 L1 2028-10-01 6/8
Yse Global Pte. Ltd. Bukit Batok CW01 C3 CW02 C1 CR01 SG ME01 L5 ME04 L3 ME05 L6 ME06 L2 2027-07-01 6/8
Albedo Design Pte. Ltd. Toa Payoh CR01 SG CR06 L3 2029-02-01 5/8
Buildwerkz Builders Pte. Ltd. Sungei Kadut CW01 C3 CR01 SG CR06 L3 CR09 L1 2027-06-01 5/8
Guru Construction Pte. Ltd. Woodlands CR01 SG 2028-02-01 5/8
Homeworks Consultancy Pte. Ltd. Sembawang CR01 SG CR06 L3 2027-09-01 5/8
Joon Thiam Industrial Services Pte. Ltd. Sungei Kadut CW01 C3 CW02 C3 CR01 SG ME12 L1 2027-11-01 5/8
Leap Integrated Pte Ltd Toa Payoh CW01 C1 CR01 SG CR06 L5 ME01 L4 ME05 L5 ME06 L4 ME12 L4 ME15 L5 2028-09-01 5/8
Shin Guan Pte. Ltd. Tuas CR01 SG 2028-02-01 5/8
Skyline Built Pte. Ltd. Geylang CR01 SG 2027-07-01 5/8
Skyrus Engineering Pte. Ltd. Bukit Merah CR01 SG 2028-07-01 5/8
Systmz Pte. Ltd. Sungei Kadut CR01 SG CR06 L5 2028-11-01 5/8

By area

Cost & how-to guides

FAQ

How much does office reinstatement cost in Singapore?

It depends on how much was built during the fit-out. Our office reinstatement cost guide lists the published 2026 figures per square foot and a tenant checklist.

How long does office reinstatement take?

Small units can be done in a few days; larger offices often take one to three weeks, plus time for landlord inspection. Start planning two to three months before the lease ends.

Do I have to reinstate to bare condition?

It depends on your lease. Some landlords accept the fit-out as-is or ask only for partial reinstatement; get the requirement in writing before you take quotes.